Deliverability review — S-09 and final question dispositions
Document: aos-deliverability-review-s09-and-final-disposition-2026-10-29 · Source revision or record: S-09 and final dispositions, 29 October 2026
AOS Specifications v1.0 · Edition dated 3 November 2026
Original architecture and specifications: Mark Sweeny, Governance Intelligence. © 2026 Mark Sweeny.
AOS-authored material is licensed under Creative Commons Attribution 4.0 International (CC BY 4.0). https://creativecommons.org/licenses/by/4.0/
Preserve third-party credits. Referenced external works remain subject to their own terms.
Canonical collection: https://www.governanceintelligence.co.uk/aos
Publication copy with editorial notices, public references and disclosure edits where applicable.
29 October 2026 · Decision authority: Mark Sweeny. Recorded by Codex.
S-09 disposition
Mark agreed to close question 9 without architectural amendment. The review did not demonstrate a contradiction between AOS-12 REQ-020 (prohibited individual emotion/health/private-conduct inference from the specified signals) and REQ-029 (permitted minimal-evidence workforce safety referral through an empowered human route, without diagnosis or invented emergency powers). A reported illness or workplace hazard can be referred without generating a prohibited personal inference.
Operational task/ownership records do not automatically become permissible evidence for personnel surveillance. Existing purpose, authority and data-use rules apply; notice alone supplies no processing permission. AOS-12 REQ-026 and its surrounding purpose/sensitive/cross-domain controls retain their meanings. No new inference exception, surveillance permission, workflow requirement or committee power is introduced. Any specific residual ambiguity should be addressed as a targeted explanatory/editorial correction, with its actual evidence identified; no such ambiguity is silently assumed resolved by this disposition.
Final disposition of the nine questions
| Question | Disposition | Controlled record |
|---|---|---|
| S-01 Derived information restrictions | Approved direction and amended proposed requirements/planned cases; actual profile and evidence gates retained | DEC-099 |
| S-02 Minimum control-metadata access | Approved direction; independent advance permission/verification remains to be instantiated and demonstrated | DEC-100 |
| S-03 Human capacity and meaningful review | Approved operational-reliance condition; real capacity and competent assessment remain required | DEC-101 |
| S-04 Classification/configuration adequacy | Approved direction; actual organisational values, assessment and material-change reassessment remain required | DEC-102 |
| S-05 Decision validity, evidence, minutes and execution | Approved revised direction after legal-source review; DEC-087 partly superseded, actual legal-form/instrument/evidence policy remains required | DEC-103 |
| S-06 Protected reporting and implicated recipients | Approved direction; actual class profiles, powers/permissions, independent routes and evidence remain required | DEC-104 |
| S-07 Technical-control scope, limits and observed evidence | Approved assurance direction; implementation/prototype and operational reliance remain separate authorised gates | DEC-105 |
| S-08 GI evaluation methods | Rejected as an architectural amendment; procedural options within the AI Governance and Ethics Committee’s existing oversight remit | S-08 disposition |
| S-09 Workforce inference/referral and cross-domain reuse | Closed without architectural amendment; no contradiction demonstrated, existing controls retained | This record |
Scope of completion
This closes disposition of these nine review questions, not the complete implementation, publication or assurance programme. No AOS case has been executed through this exercise; proposed detailed wording, actual organisation profiles, endpoint/schema compatibility, qualified independent assessment and applicable G3/G4/operational approvals remain separate. The documentary corrections D-01–09 and expanded README adoption remain separately recorded. The original assessment/review is retained; subsequent decisions determine the live status.
No new DEC number, requirement, test, committee power, permission or technical baseline version is introduced by closing S-09. All source specification versions and catalogue counts remain as recorded after DEC-105.
Provenance
Mark’s “agreed” in this chat approves the stated S-09 disposition. Source status records and the local review carry the completion annotation. Before/after status-file copies and saved-content hashes are retained in the local AOS/deliverability-review-2026-10-29/disposition-S09 folder. This is a disposition record, not independent technical or legal assurance.