AOS-20 — Governance Intelligence architecture and charter
Document: aos-20-governance-intelligence-architecture-and-charter · Source revision or record: v0.8
AOS Specifications v1.0 · Edition dated 3 November 2026
Original architecture and specifications: Mark Sweeny, Governance Intelligence. © 2026 Mark Sweeny.
AOS-authored material is licensed under Creative Commons Attribution 4.0 International (CC BY 4.0). https://creativecommons.org/licenses/by/4.0/
Preserve third-party credits. Referenced external works remain subject to their own terms.
Canonical collection: https://www.governanceintelligence.co.uk/aos
Publication copy with editorial notices, public references and disclosure edits where applicable.
DEC-104 adopted — 29 October 2026: Current revision 0.8. Each mandatory protected-finding category requires assessed technical-failure and implicated-person interference arrangements with an appropriately independent authorised alternative and no implicated sole release gatekeeper. Decision/amendment record. External reporting is conditional on justified lawful authority, not a default. Exact profiles/permissions, protected_finding v0.3 compatibility and actual evidence remain gates; amended wording retains ordinary separate review and cases are planned/unexecuted. Earlier contrary or narrower baselines are history for this scope.
DEC-103 adopted — 29 October 2026: Current revision 0.7. Decision validity/effective time, attributable evidence/authentication, minutes approval and permission to execute are separate. DEC-087 is partly superseded; decision/amendment and legal-source record. No universal later-minutes or second decision-record approval gate. Exact instruments/evidence policy, KX-06 v0.3 compatibility and ordinary separate review/readiness gates remain required; cases unexecuted. Earlier contrary wording is historical only where explicitly identified.
Editorial edition — 29 October 2026: Mark authorised documentary corrections D-01–09. This edition reconciles navigation, count/revision pointers, conformance links and historical scope labels; existing technical meanings, requirement/IF/decision identities and proposed/planned status are retained. The internal version below identifies the retained functional baseline; this dated editorial edition identifies the corrected document. See the current document inventory and correction record. Earlier dated adoption baselines are historical snapshots; exact logical family/view revisions are in Exchange Register §4.
AOS-25 oversight counterpart alignment — 7 October 2026: AOS-25 v0.1 now supplies the drafted oversight/drift/learning and GI research-portfolio counterpart. Reference-only revision; all existing requirement/case/contract rows preserved. AOS-00/Map v0.31, DEC-001–091; AOS-25 v0.1; AOS-20 v0.4/AOS-21 v0.5/AOS-22 v0.3/AOS-23 v0.4/AOS-24 v0.2/AOS-30 v0.4 (counterpart-reference alignment only); AOS-01–05 v0.8, AOS-14 v0.4; Shared v0.14/Core v0.6/Exchange Register v0.13; source matrix v0.14; template v0.4; Control Coordination v0.2/Protected Reporting and Recovery v0.1. No build/activation/readiness approval. Next: author GI-set consistency/disposition review across AOS-20–25 and AOS-30, then AOS-40 acceptance scenarios under item 8; independent project review remains deferred. Earlier dated consultation/adoption entries remain history.
Current AOS-30 alignment — 7 October 2026: functional drafting and consistency alignment complete under Mark’s instruction. AOS-00/Map v0.25, DEC-001–089; AOS-01–05 v0.8, AOS-14 v0.4, AOS-20 v0.3 and AOS-30 v0.3; Shared v0.9/Core v0.6/Exchange Register v0.8; source matrix v0.9 and template v0.4 unchanged; Control Coordination v0.2/Protected Reporting and Recovery v0.1 unchanged. Earlier dated baseline/adoption/next-step entries are history. CR30-01–03 are closed at the functional-document level; implementation/commissioning evidence remains separate. No new DEC/REQ/VER/IF identifier or operating power is introduced.
| Document control | Value |
|---|---|
| Component / version / date | AOS-20 / 0.8 / 29 October 2026 |
| Status | Review draft; exact requirement wording proposed |
| Architecture / decision baseline | AOS-00/Mapv0.44; DEC-001–097; Phase2 exclusion under DEC-097; prior consultation/adoption baselines are history |
| Governing source baseline | Foundational Principles v4; AOS Reasoning Principles v6; Governance Intelligence Tests, controlled supplied source manifest |
| Common definitions | AOS-01–05 v0.8; AOS-14 v0.4; Shared v0.15/Core v0.6/Exchange Register v0.14; source matrix v0.15; template v0.4; Control Coordination v0.2/Protected Reporting and Recovery v0.1. Earlier consulted definitions remain in dated history. |
| Accountable project owner / custodian | Mark Sweeny |
| Operational owner / approvers | Organisation's board and empowered governance roles; appointments/instruments unresolved |
| Author / review | Codex at Mark's request; author document review only; Mark review pending; independent reviewer unassigned/deferred |
| Quality / template | AOS-QS v0.1; component template v0.4 |
| Release / readiness | Whole-component logical specification; no build/activation or G1–G4 readiness approval |
| Approval / history | 0.5 — GI-CR-01–04 author consistency correction/closure under Mark’s instruction; existing identifiers and proposed/planned status preserved. 0.4 — drafted AOS-21–25 counterpart/reference alignment only; no requirement/case/contract change. 0.1 initial draft under seven approved GI directions, with DEC-082 agentic research addition. Approval of direction is not approval of wording, whole document, implementation or outcomes. Current revision incorporates DEC-086 common research inheritance and reciprocal logical adoption, 6 October 2026; prior decision/record statuses retained. 7 October — authorised AOS-30 functional adoption, Chair/board approval propagation and material-correction alignment; no new identifiers or operating power. |
1. Purpose and scope
1.1 Purpose and architectural problem
GI helps an organisation connect what it knows with what it is for. Without a whole-function charter, corpus, synthesis, assessment, explanation and oversight can acquire inconsistent powers; machine interpretation can become human governance by default. AOS-20 specifies authorising powers, mandatory duties and internal boundaries for GI as the AOS-20–25 whole. It enables informed, contestable human judgement rather than producing automated moral adjudication.
1.2 Outcome and scope
An authorised person can identify the evidence, current governance basis, uncertainty, meaningful options, remaining human question and accountable next step behind a GI output. Required concerns reach their permitted audience through a tracked duty. GI's own adequacy is researched and challenged, while adaptation is approved through controlled human change. Scope includes the protected charter, organisational profiles, cross-domain analysis, corpus/precedent governance, canonical analysis/review, oversight, research-for-adaptation and human interfaces.
1.3 Exclusions and stakeholders
GI is not a sixth peer sensing domain. AOS-10–14 supply domain evidence; 13 owns operational coordination; 14 external exchange; 01/03/04/05 common powers/use/agent/runtime enforcement; 02 records. The real board/committees exercise governance, with 30 providing software support. AOS-20 does not confer intrinsic telos, feelings or conscience on software, provide legal/regulatory certification, introduce private behavioural sensing, or create a scheduled agent merely by specifying research. Board, executives, NEDs, residents, staff, governance stewards, operators, suppliers and reviewers have distinct permitted roles and interests.
2. Authority and sources
FP v4/RP v6 govern; recorded architecture decisions constrain design; books explain intent; working papers and GIL v2 supply reconciled proposals. Source abbreviations below are locators, not invented principle numbers. Substantive source conflicts go to the project owner and applicable organisational authority.
| Source | Exact locator / use | Standing |
|---|---|---|
| FP | Foundational_Principles_v4.docx, printed principles 1–10 | Governing settlement. |
| RP | AOS_Reasoning_Principles_v6.docx, domains 1–9 and opening phrases named in REQ table | Governing logic; annual independent precedent review and protected escalation are already present. |
| GT | Governance_Intelligence_Tests.docx, M1.1–14/M2.1–15 | Assurance questions, including irreducibly human/institutional assessment. |
| B4 | Book 4.docx: Governance Intelligence, Governance Hub, AI/Governance/Ethics, Epistemic Brake | Intent; adjudication/membrane metaphors reconciled with DEC-005 software/human demarcation. |
| GI-WP | Governance Intelligence- Internal Architecture - Working Paper.md: Five elements, Corpus, Charter, Governance of drift, Validation regime | Working design, originally RP v5; reconciled to v6/DEC-079–085. |
| GIL | GIL_Technical_Specification_V2.docx, May 2026: §§1–3, governance instruments/assessment, §§6–9 | Reuse mainly in 21/23; six-peer framing, blanket review-before-UDL and particular stack/scores/timing not inherited as defaults. |
| GI-FT / Petra / CAP-01 | GIL Forward Tasks; Petra note; Trade-Off Divergence draft §§2–7 | Self-calibration deferred by DEC-018; persona style is not power/interiority; CAP-01's no-persona-ranking and independent profile retained. |
| GI review / Mark | GI Material Review v0.2, questions/disposition; 6 October explicit agentic research addition to Q04 | DEC-079–085 approved direction; research for adaptation is Mark-derived, not claimed as ISO-derived. |
| Common controls | Current dossiers above, exact declared family/view revisions | Adopt shared proposed definitions rather than duplicate schemas. Protected-route/recovery standards provenance is the Reporting/Recovery annex §7. |
The common exchange register, shared contracts, core record contracts and protected reporting/recovery annex are the single common definitions. The GI review and approval record preserves submitted recommendations and Mark’s research addition.
No additional ISO clause obligation is asserted in this draft. Inherited standards references distinguish verified NIST control principles, ISO edition/scope alignment pending licensed clause checks, and AOS-specific choices. New regulatory/standards research requires current primary evidence and controlled applicability review; historic book references are not automatically current law.
DEC-104 — protected reporting under failure and implicated-person interference
Each mandatory protected-finding category shall have an approved reporting arrangement assessed against both technical failure and interference by implicated people. The profile shall identify the intended recipient, possible conflicts and an appropriately independent authorised alternative; an implicated person shall not be the sole gatekeeper deciding whether the required finding reaches its authorised audience.
Authority/use permissions, minimum report content, recipient verification, custody, route/change dependencies, tracking ownership, acceptance, cover and escalation are established in advance. An external route is included where justified and lawfully authorised; external reporting is not a universal default and a finding creates no extra disclosure power. Planned exercises address failed infrastructure, unavailable/implicated recipients, apparent alternatives controlled by the same implicated gatekeeper and attempted suppression. Missing adequate arrangements remain an explicit owned gap, prevent claims of operational protected-reporting assurance and withhold affected dependent reliance under existing gates; they do not create false delivery, ownership transfer or blanket shutdown of separately authorised service. Original tracking duty persists until actual scoped acceptance.
The organisation’s profile binds each required finding class to normal/alternate authorised audiences, conflict criteria/evidence and accountable assessment, disclosure basis/minimal payload, independently verifiable recipients/permissions, credentials/custody and route/reconfiguration controls, failure/compromise assumptions, tracking/cover/escalation, human fallback, evidence and review triggers. Test both infrastructure/common-dependency independence and organisational release/recipient/custody control; neither implies the other. No administrator, executive sign-off or report-validation step may silently remove a required duty. The declared threat/governance scope and residual limitations must be visible: this is not an unlimited guarantee against every holder of legal/constitutional change powers. Inadequacy returns to an empowered accountable reviewer; the reporting agent cannot invent a recipient or grant itself onward-disclosure authority.
3. Responsibilities
| Owner / function | Owns | Reserved boundary |
|---|---|---|
| 20 whole GI charter | Remit, internal responsibility boundaries, mandatory duties, canonical analysis semantics | No self-authorisation or constitutional decision. |
| 21 corpus / human Governance Knowledge Steward | Sources/tiers, currency, approved decision/precedent capture, faithful maintenance | Material meaning/conflicts referred; curation is not adoption/amendment power. |
| 22 synthesis/interpretation | Cross-domain patterns, evidenced propositions/options, constitutional classification/referral | No moral winner from inferred weights or self-ratified ruling. |
| 23 artefact assessment/monitoring | Governed assessment criteria, currency and calibrated review evidence | Cannot equate assessment with organisational compliance certificate. |
| 24 presentation/Petra | Faithful accessible explanation, permitted canonical projections and challenge | Cannot revise substance, invent review or attend live deliberation. |
| 25 oversight/research coordination | Drift/overrides/blind spots, review evidence, GI-adaptation research coverage/challenges and tracked dispositions | Self-assessment is an input, not independent sufficiency assurance. |
| 30 / empowered people | Human decision/acceptance, post-meeting approved records, review dispositions/action owners | Board retains telos/charter powers; software is not the Governance Hub itself. |
Board-approved core permissions/prohibitions/duties are protected; operational purpose/source/event/review/audience/timing profiles are separately approved under 01. Roles include accountable GI owner, steward, analytical validator, independent reviewer, research custodian, protected duty tracker/recipient/cover, change proposer/approver and runtime releaser. Actual appointments and compatible separation of powers are commissioning dependencies. The independent human report and GI self-assessment are each prepared without reference to the other before formal comparison; a conflict of interest is disclosed and routed under approved governance arrangements. DEC-010–012 review obligations remain despite project independent review being deferred.
3.1 Component-owned external research
Under DEC-086, AOS-20 owns the relevance and substantive implications of external research into its own function/specification, inheriting AOS-04 v0.7 §§3.1/5.1/6.6/10.8 (CON-009), AOS-02 v0.7 §6.6 (CON-007) and AOS-01 v0.7 §§6.6/10.8. Shared agents/collection infrastructure may serve distinct profiles; Boundary does not become the substantive research owner for every component. Internal operational monitoring and GI organisational sensing remain separate. Research observes, analyses, challenges and proposes; it cannot amend specifications, expand tools/powers, approve deployment or reopen DEC-018.
| Controlled profile allocation | Component-specific meaning / owner and gate |
|---|---|
| Remit/questions/baseline | Does external evidence expose incomplete, incorrect, ambiguous or insufficiently resilient functions, or meaningful improvement? Topics: external developments affecting GI charter, corpus stewardship, interpretation/precedent, artefact assessment, explanation, oversight and human governance interfaces; relevant housing/nonprofit governance obligations and AI governance practice. Bind exact assessed specification/dependency revisions, including their draft/approval status. |
| Jurisdiction/status/sources | Prefer official housing/nonprofit regulators and government, recognised governance/standards bodies, primary research and authoritative incident/practice evidence. Applicable jurisdictions, exact source list/admission/currentness criteria and licensing are owned profile settings; distinguish proposals, publication, enactment/adoption and effective dates. Verification is not organisational adoption or professional legal judgement. |
| Assignment/cadence/triggers | The accountable GI owner owns AOS-20’s charter-level remit and review. AOS-21–25 each own their specialist remit and substantive assessment; AOS-25 oversees portfolio coverage and coordinates relevant specialists without replacing their ownership. Assigned agent/service, approved cadence/event triggers, coverage periods and accountable tracker/cover appointments remain commissioning dependencies; no default schedule or separate deployment is mandated. |
| Authority/use/retrieval | Applicable 01/03 permissions and 05 controls govern task/tools/data/locations; 14 governs external retrieval/admission and source verification. Public accessibility is not unrestricted reuse/disclosure; hostile source content is data, never an instruction. |
| Evidence/assessment | Common 02 profile/run/finding/disposition views bind exact sources/assurance, publication/event/access/effective dates or explicit unknown reasons; evidence versus inference; affected CAP/FUN/REQ/CON/decision/source, alternatives, uncertainty, materiality/urgency and cross-component owners. |
| Coverage/quality | Report actual complete/partial/failed/cancelled/not-performed coverage and bounded no-material-finding. Component reviewers with 04/40 approve relevance, evidence-fidelity, false/missed-finding and limitation rubrics before dependent reliance; deterministic enforcement is assessed separately. |
| Review/change | Named permitted recipient/tracker, deadline/cover/escalation and empowered disposition use 13/30 and 01. Acceptance for further work, amendment approval, verification, applied release and outcome closure remain distinct. Live urgent implications use separately authorised response; research supplies no emergency power. |
| Setup gate | Component owner owns missing profile values; 01 powers, 03 use, 05 enforcement, 14 access, 02 schemas and 04/40 evaluation owners supply their evidence. Missing mandatory values withhold dependent activation/reliance and retain an owned coverage exception. Author drafting does not establish operating readiness. |
4. Capabilities, functions and requirements
4.1 Capabilities
| AOS-20-CAP | Outcome |
|---|---|
| 001 | Operate under a protected authorising/obligating charter and valid profile. |
| 002 | Connect permitted cross-domain evidence to governed corpus and contestable options. |
| 003 | Preserve human approval/precedent and canonical review/presentation boundaries. |
| 004 | Deliver protected concerns through accountable human handoffs. |
| 005 | Review drift/oversight and support independently contestable assurance. |
| 006 | Research developments challenging GI adequacy and propose governed adaptation. |
4.2 Functions
All functions require approved scope/use and current dependency evidence; unresolved mandatory conditions block dependent reliance/effect and retain an owned exception. FUN identifiers use AOS-20-FUN-NNN.
| FUN | Trigger / inputs | Behaviour / output / failure |
|---|---|---|
| 001 | Approved charter/profile/change | Establish scoped eligible/applied state with 01/05; incomplete activation cannot grant favourable reliance. |
| 002 | Source/corpus amendment or confirmed human record | 21/steward validates tier/provenance/powers and captures accepted content; conflicting authority goes to human resolution. |
| 003 | Approved organisational event/cycle or human request | 22 synthesises permitted facts/assurance, pattern and conflict; source gaps remain explicit. |
| 004 | Governance artefact/currency event | 23 assesses against reviewed criteria and organisation context; distinguish output confidence/assurance/review. |
| 005 | Synthesis needing options/classification | Prepare options, consequences/impossible alternative and human question; unresolved constitutional classification escalates. |
| 006 | Provisional analysis/validation/explanation request | Bind canonical revision/review and 03-permitted 24 presentation; revision change invalidates old review for changed substance. |
| 007 | Protected finding/failed handoff | Create minimal permitted tracked referral via 13/05/30; receipt is not responsibility or service completion. |
| 008 | Annual/material drift trigger/outcome | 25 and independent human prepare separate reports; empowered disposition/actions feed back to corpus/controls. |
| 009 | Approved research cycle/event/new source | Agentic research compares current GI baseline with primary evidence, coverage and uncertainty; creates candidate or explicit coverage/no-finding result. |
| 010 | Research candidate/change review | Track exact affected elements, semantic owners and human disposition; accepted proposal proceeds to controlled change, never direct amendment. |
| 011 | Material correction/restriction/current-state recovery | Reassess dependencies and prior consequences, reconcile effects/reservations/duties before scoped continuation. |
4.3 Requirement register
Rows are AOS-20-REQ-NNN, component-level proposed obligations. S denotes source/approved-direction derivation; I denotes engineering completeness implementing that direction, not a new approved standard. Category is the clause's function (charter, corpus, analysis, disclosure, duty, oversight, research or runtime). Every row inherits: owner GI component owner with the authoritative semantic owner in §§3/6; project approver Mark, operational approval per §§7/16; status proposed; release scope logical component only; rationale protect the stated boundary/outcome; history initial v0.1, none superseded; dependencies §§6/16/17; planned VER references below. No commissioning blank supplies a default. Exact source phrases are defined in §§2/8.
| REQ | Independently verifiable obligation | Level / derivation / exact anchor | Responsibility / dependencies | VER |
|---|---|---|---|---|
| 001 | The GI charter shall require board approval of its exact constitutional core before dependent GI operation. | Component / S-I; DEC-079; FP1/8; RP2 boundary instrument | §§3/6/16/17; profile/owner/contract applicability required | 001 |
| 002 | GI shall use an operation-scoped profile only with evidenced current approval and compatible applied state. | Component / S-I; DEC-079; DEC-068; KCR-02 | §§3/6/16/17; profile/owner/contract applicability required | 001 |
| 003 | An operational profile change shall not weaken a charter permission boundary, prohibition or mandatory duty. | Component / S-I; DEC-079; FP3; RP8 protected duty | §§3/6/16/17; profile/owner/contract applicability required | 001 |
| 004 | Suspension or retirement of normal GI operation shall preserve owned protected-reporting and unresolved service duties. | Component / S-I; DEC-073/075/079; KPR-01/03 | §§3/6/16/17; profile/owner/contract applicability required | 002/032 |
| 005 | Each GI profile shall identify the accountable human roles and approved review, cover and escalation responsibilities before use. | Component / S-I; DEC-080/083; RP1 human accountability | §§3/6/16/17; profile/owner/contract applicability required | 002 |
| 006 | A human corpus steward shall admit or maintain material only within the explicitly delegated curation policy. | Component / S-I; DEC-080; GI-WP Corpus; RP8 explicit authority | §§3/6/16/17; profile/owner/contract applicability required | 003 |
| 007 | Verification of an external source shall not be represented as organisational approval of a new governance obligation. | Component / S-I; DEC-080; FP8; AOS-00 DEC-005 | §§3/6/16/17; profile/owner/contract applicability required | 003 |
| 008 | The corpus workflow shall refer disputed authority or material changes of meaning to the empowered human decision-maker. | Component / S-I; DEC-080; RP6 precedent integrity | §§3/6/16/17; profile/owner/contract applicability required | 003 |
| 009 | GI shall identify the distinct external, operational and founding-purpose corpus tiers and applicable approval/change regimes in its analysis. | Component / S-I; GI-WP Corpus; DEC-079/080; FP1 | §§3/6/16/17; profile/owner/contract applicability required | 003 |
| 010 | An approved precedent shall bind exact content, empowered approval, rationale, context, limitations and applicability. | Component / S-I; DEC-081; RP6 precedent integrity | §§3/6/16/17; profile/owner/contract applicability required | 004 |
| 011 | Conversational confirmation shall not be treated as approval to change the authoritative corpus or governing instruments. | Component / S-I; DEC-081; DEC-008/024; RP2 boardroom | §§3/6/16/17; profile/owner/contract applicability required | 004 |
| 012 | GI shall not approve its own normative interpretation or give its own proposal governing authority. | Component / S-I; DEC-081/082; FP2/8 | §§3/6/16/17; profile/owner/contract applicability required | 004 |
| 013 | GI shall refer incommensurable value choices and unresolved constitutional classification to authorised human judgement. | Component / S-I; FP2; DEC-005/081; RP2 permanent human | §§3/6/16/17; profile/owner/contract applicability required | 005 |
| 014 | GI analysis and research shall remain within the approved purpose, source scope and data-use conditions for the exact task. | Component / S-I; DEC-082; RP9 declared purpose; AOS-03 | §§3/6/16/17; profile/owner/contract applicability required | 006/025/027 |
| 015 | GI shall support approved proactive cross-domain review of individual signals and their material cumulative patterns. | Component / S-I; DEC-082; FP10; GT M1.13 | §§3/6/16/17; profile/owner/contract applicability required | 006/025/027 |
| 016 | GI shall preserve materially competing source accounts with origin and separate assurance provenance. | Component / S-I; DEC-046/062/063; RP7 transparency | §§3/6/16/17; profile/owner/contract applicability required | 007/026 |
| 017 | A GI output shall identify material assumptions, incomplete coverage, evidence conflicts, uncertainty and known limitations. | Component / S-I; FP5/6; RP7 uncertainty; GT M2.4 | §§3/6/16/17; profile/owner/contract applicability required | 007/025/026 |
| 018 | A material option set shall include the infeasible, unaffordable or unacceptable option with the reason it cannot be made to work. | Component / S-I; RP1 option set; FP2; GI-WP Interpretive | §§3/6/16/17; profile/owner/contract applicability required | 008/028 |
| 019 | GI shall not adjudicate between incommensurable goods; that judgement remains with empowered humans. Explicitly approved commensurable Mode 1 comparisons remain permitted within remit; approval of moral weights cannot transfer Mode 2 judgement to GI. | Component / S-I; FP2; DEC-005; RP2 permanent human | §§3/6/16/17; profile/owner/contract applicability required | 005/008 |
| 020 | Deferred to Phase 2; not a current architectural requirement/capability/test. Legacy wording: AOS-20-REQ-020 (deferred under DEC-097); identifier retained for traceability only. | Component / S-I; CAP-01 §§2/6; DEC-017; FP2 | §§3/6/16/17; profile/owner/contract applicability required | 008/028 |
| 021 | Each canonical GI analysis shall identify exact revision, purpose, source and model/configuration references and review status. | Component / S-I; AOS-20-IF-001; Shared §4.4; DEC-084 | §§3/6/16/17; profile/owner/contract applicability required | 009/031 |
| 022 | A formal assessment or material decision-support conclusion shall evidence designated human validation before being represented as reviewed or entering its applicable formal decision workflow. | Component / S-I; DEC-084; RP1 accountability; GIL human review reconciled | §§3/6/16/17; profile/owner/contract applicability required | 009 |
| 023 | Model confidence shall not substitute for fact assurance, validated calibration or required human review. | Component / S-I; DEC-063/084; RP7 uncertainty; REC-Q | §§3/6/16/17; profile/owner/contract applicability required | 007 |
| 024 | Permitted renderings shall preserve the canonical analysis revision, material meaning, uncertainty and review status. | Component / S-I; DEC-085; AOS-20-IF-001; AOS-24 boundary | §§3/6/16/17; profile/owner/contract applicability required | 009 |
| 025 | An independent challenge profile shall be approved through its independent governance route without tuning or suppression by the executive whose paper is tested. | Component / S-I; DEC-085; CAP-01 §4; GT M2.5 | §§3/6/16/17; profile/owner/contract applicability required | 010/028 |
| 026 | An independent preparation window shall retain the required management response workflow and shall not delay protected mandatory reporting. | Component / S-I; DEC-085/083; RP8 protected duty | §§3/6/16/17; profile/owner/contract applicability required | 010 |
| 027 | GI research retrieval or disclosure across the organisational boundary shall use AOS-14 and independently valid authority and permitted-use evidence. | Component / S-I; DEC-005/082; RP8 external contact; AOS-03/14 | §§3/6/16/17; profile/owner/contract applicability required | 011/027 |
| 028 | GI shall exclude AI presence, observation and real-time capture of board deliberations. | Component / S-I; RP2 boardroom; DEC-008; FP2 | §§3/6/16/17; profile/owner/contract applicability required | 011 |
| 029 | GI shall create a protected escalation duty for credible material indications within the approved mandatory finding classes. | Component / S-I; DEC-083; RP8 protected duty; KPR-01/03 | §§3/6/16/17; profile/owner/contract applicability required | 012/025/026/029 |
| 030 | The GI handoff workflow shall route an implicated or unresponsive normal recipient through the approved appropriately independent authorised alternative and cover/escalation process, without making an implicated person the sole release gatekeeper. | Component / S-I; DEC-083; KPR-03; RP1 human layers | §§3/6/16/17; profile/owner/contract applicability required | 013/029 |
| 031 | A protected notification shall use separately permitted minimal content, verified audience and the approved reporting route. | Component / S-I; DEC-074/083; KPR-02; AOS-03 | §§3/6/16/17; profile/owner/contract applicability required | 013/032 |
| 032 | The GI tracking owner shall retain a handoff duty until explicit human responsibility acceptance and preserve unresolved outcome duties afterwards. | Component / S-I; DEC-075/083; KPR-03; KX-26 | §§3/6/16/17; profile/owner/contract applicability required | 013/025/031/032 |
| 033 | Discretionary executive validation shall not suppress or delay an urgent protected escalation. | Component / S-I; DEC-083/084; RP8 protected duty | §§3/6/16/17; profile/owner/contract applicability required | 012/029 |
| 034 | Interpretation and precedent shall undergo an independently prepared human review alongside GI assessment at least annually and on material drift triggers. The GI self-assessment and independent human account shall each be prepared without reference to the other account before formal comparison. They may use the same permitted underlying evidence; differing scope/revisions remain explicit. Preserve both original accounts and subsequent responses or revisions under governed lifecycle rules. | Component / S-I; DEC-010/011; RP6 precedent integrity; GI-WP drift | §§3/6/16/17; profile/owner/contract applicability required | 014 |
| 035 | Each independent review shall record an empowered disposition with accountable corrective-action owners and completion dates where required. | Component / S-I; DEC-012; RP1 feedback; GI-WP drift | §§3/6/16/17; profile/owner/contract applicability required | 014 |
| 036 | GI oversight shall examine aggregate overrides, precedent/purpose drift, evidence blind spots and model-framework divergence. | Component / S-I; RP2/6 standing review; FP3/10; GT M2.9/13/15 | §§3/6/16/17; profile/owner/contract applicability required | 014 |
| 037 | GI shall be supported by agentic research processes assessing developments that may imply adaptation of the GI function itself. | Component / S-I; Mark 6 October Q04 addition; DEC-082; FP10 | §§3/6/16/17; profile/owner/contract applicability required | 015/030 |
| 038 | Each GI research process shall bind to a current approved remit, accessible GI specification baseline, permitted sources and accountable review route. | Component / S-I; DEC-082; RP8 explicit delegation; QS-19/25 | §§3/6/16/17; profile/owner/contract applicability required | 015 |
| 039 | A research coverage record shall identify sources, dates, method, limitations and the distinction between source evidence and inference. | Component / S-I; DEC-082; FP4/6; RP7 provenance | §§3/6/16/17; profile/owner/contract applicability required | 015/018/030 |
| 040 | A research challenge shall identify the affected GI baseline/element, supporting evidence, uncertainty, cross-component impacts and proposed review or change. | Component / S-I; DEC-082; template §19; FP10 | §§3/6/16/17; profile/owner/contract applicability required | 016/030 |
| 041 | A research candidate shall retain an accountable accepted, rejected, deferred or unresolved disposition and linked follow-up obligations. | Component / S-I; DEC-082; RP1 feedback; template §17/19 | §§3/6/16/17; profile/owner/contract applicability required | 016/031 |
| 042 | Research processes shall not amend the controlled specification or approve/activate their own proposed changes. | Component / S-I; DEC-082; research observe/analyse/challenge/propose; AOS-01 | §§3/6/16/17; profile/owner/contract applicability required | 017 |
| 043 | A GI research finding affecting another component shall be referred to its semantic owner without silently expanding the GI research remit. | Component / S-I; DEC-005/082; FAR cross-component challenge; AOS-14 | §§3/6/16/17; profile/owner/contract applicability required | 017/030 |
| 044 | A research report shall distinguish no material finding within completed coverage from failed, partial or unperformed coverage. | Component / S-I; DEC-082; FP5/6; REC-Q incomplete evidence | §§3/6/16/17; profile/owner/contract applicability required | 018 |
| 045 | The GI research capability shall not introduce exploratory agent self-calibration deferred by DEC-018. | Component / S-I; DEC-018; GI-FT deferred proposal | §§3/6/16/17; profile/owner/contract applicability required | 017 |
| 046 | An accepted research proposal shall require the applicable controlled approval, compatibility and evaluation steps before any dependent deployment or profile activation. | Component / S-I; DEC-057/068/079/082; KCR-02; AOS-04/05 | §§3/6/16/17; profile/owner/contract applicability required | 019/030 |
| 047 | A consequential GI operation shall obtain the current combined checkpoint and applicable authoritative cumulative reservations before its effect. | Component / S-I; DEC-067/070/071; CHECK/ACC/RSV; FP10 | §§3/6/16/17; profile/owner/contract applicability required | 020/031/032 |
| 048 | GI recovery shall withhold dependent continuation until accepted current-state proof and prior effect/reservation reconciliation are evidenced for its scope. | Component / S-I; DEC-076/077/078; KPR-04/05/06 | §§3/6/16/17; profile/owner/contract applicability required | 020/032 |
| 049 | A material evidence or governance change shall flag affected pending analyses for reassessment and significant completed consequences for owned review. | Component / S-I; DEC-069; KCR-03; RP1 feedback | §§3/6/16/17; profile/owner/contract applicability required | 021/026/032 |
| 050 | GI shall preserve reconstructable trigger, evidence, authority, output, human rationale, effect and outcome links without treating retrospective explanation as proof. | Component / S-I; FP4; QS-19; RP7 audit; REC-E/A/D/X/Q | §§3/6/16/17; profile/owner/contract applicability required | 022 |
| 051 | GI explanation and challenge workflows shall provide approved accessible alternatives without treating non-engagement as assent. | Component / S-I; FP4/7; RP9; AOS-03/30 | §§3/6/16/17; profile/owner/contract applicability required | 023 |
| 052 | GI assurance shall distinguish executed technical checks from human Mode 2 and institutional assessment and shall not self-certify those assessments sufficient. | Component / S-I; GT introduction; FP2/5; QS-24–28; AOS-40 | §§3/6/16/17; profile/owner/contract applicability required | 024 |
4.4 External-research adoption requirements
New AOS-20-REQ-053–057 originate in v0.2, 6 October 2026; proposed logical component wording, accountable semantic/component owner per §3.1, project approver Mark, organisational instruments/appointments open. No prior REQ is retired or promoted.
| REQ | Proposed independently verifiable obligation | Derivation / function / contract | Planned VER |
|---|---|---|---|
| 053 | The component shall bind its external-research task to a controlled component-specific profile inheriting AOS-04-CON-009 and the exact assessed baseline/status. | DEC-086; AOS-20-CAP-006/FUN-009/CON-007; common 04/02/01 inheritance | 033 |
| 054 | The component shall produce and consume AOS-02 §6.6 profile/run/finding/disposition views with linked evidence, assurance, legal/standards applicability/status and explicit coverage limitations. | DEC-086; AOS-20-CAP-006/FUN-009/CON-007; common 04/02/01 inheritance | 035 |
| 055 | Shared retrieval, duplicate coalescing and source/baseline correction shall retain each affected component’s assessment, accountable review duty and recorded reassessment. | DEC-086; AOS-20-CAP-006/FUN-009/CON-007; common 04/02/01 inheritance | 036 |
| 056 | Research review shall retain an accountable handoff and empowered exact-revision disposition, with separately authorised urgent handling and no implied amendment or release approval. | DEC-086; AOS-20-CAP-006/FUN-009/CON-007; common 04/02/01 inheritance | 037 |
| 057 | Dependent research reliance shall require accepted component relevance/evidence-fidelity and false/missed-finding evaluation criteria, assessed separately from deterministic control enforcement. | DEC-086; AOS-20-CAP-006/FUN-009/CON-007; common 04/02/01 inheritance | 038 |
5. State model
States are separate governed objects, not one universal “complete” flag. Identifiers and transition evidence use common record definitions.
| Object | States / transition authority | Missing, expiry or closure rule |
|---|---|---|
| Charter/profile | proposed → human approved → activation pending → applied compatible; suspended/superseded | Approval not activation; changed/expired scope rechecked. Suspension retains duty. |
| Analysis | draft/provisional → submitted → reviewed/returned → superseded/withdrawn | Review binds exact version/use; stale or changed dependencies trigger reassessment. Reviewed not action approval. |
| Interpretation/precedent | proposed → empowered approved/rejected → applicable/restricted/withdrawn | Conversation not precedent; context/limitations bound; approved change/impact application tracked. |
| Finding/handoff | detected → permitted report attempted → received/validated → responsibility accepted → follow-up/owned unresolved → evidenced duty disposition | Retry/timeout never means accepted or closed; case/service outcomes separate. |
| Research candidate | observed → evidenced/review pending → accepted/rejected/deferred/unresolved → controlled change candidate if accepted | Coverage and no-finding status separate; acceptance not specification amendment/deployment. |
| Review action | assigned → accepted owner → in progress/overdue → completed with evidence or unresolved | Reaffirmation does not erase limitations; overdue ownership/escalation persists. |
6. Semantic contracts and interfaces
6.1 Shared views and reciprocal ends
All rows are AOS-20-CON-NNN. Preserve existing AOS-20-IF-001 canonical analysis; no research IF number is invented. 20 adopts Core/Shared/Exchange definitions and declared exact view versions; AOS-30 v0.3 functional participation is aligned; 21–25 are drafted functional counterparts, allocated in Register §§16–20; actual compatibility/assurance remains pending. Kernel producer responsibilities already exist; this consumer/producer declaration does not establish executed interoperability.
| CON | Purpose | Producer → consumer | Minimum meaning / single definition |
|---|---|---|---|
| 001 | Charter, profile and current authority | 01 governance/30 approved decision → 20/21–25; 05 applied state, 02 custody | KX-02/05/06/18; REC-A and CHECK/ACT; exact charter/profile scope, approval, effective restrictions and applied-state evidence |
| 002 | Corpus, evidence, assurance and correction | 21 steward/source owners/02 structures → 20/22/23/25; 20 returns impact refs | KX-01/08/09/10/13/15; REC-E/Q; source/tier/revision, separate assurance, lifecycle constraints and current correction dependencies |
| 003 | Canonical analysis, AOS-20-IF-001 | 21/22/23/25 findings under 20 remit → 24/authorised humans/30; 02 custody | KX-22; Shared §4.4 exact analysis/version/purpose/options/uncertainty/review/disclosure state; not an action grant |
| 004 | Human approval, interpretation and precedent | Authorised post-meeting/other human workflow via 30 → 01/20/21/25; 02 custody | KX-06/05/13; exact decision/powers/rationale/context/review/applicability; Chair draft approval distinct from board approval of exact minutes and decision under DEC-087; confirmation/approval/application distinct |
| 005 | Protected findings and continuing handoff | 20/25 or permitted research producer → 13 routing/30 empowered audience; 05 protected route; 02 custody | KX-07/19 protected_finding v0.2/26 v0.2; separately permitted payload, verified route, owner/cover/acceptance and unresolved duties |
| 006 | Oversight, drift and review disposition | 25 GI assessment and independent human reviewer → authorised Committee/30; outcome → 20/21/25 | KX-01/08/17/22/06; distinguish independent report, self-assessment, annual/triggered review and disposition/action evidence |
| 007 | Research evidence and change candidate | Approved GI research processes using 14 ingress → 20/25/affected semantic owners/human reviewer; 02 custody | Existing envelope/REC-E/Q/KX-13/22/06 views; §6.2 candidate fields supplement a proposed supporting view, no new approved IF allocation |
| 008 | Agent/runtime, accounting and recovery | 04 task/profile and 20 constraints → 05 gate/account; 05 execution/recovery evidence → 20/25/01/03; 02 custody | REC-X; CHECK/ACT/CHG/ACC/RSV/WHD, KX-18/20; binding actual attempt/effect/reservation and accepted scoped recovery |
| 009 | Permitted presentation and external disclosure | 03 use/disclosure decision + 20 canonical content → 24 presentation/14 dispatch → authorised audience; result → 20/30 | KX-03/14/23; REC-D/X and AOS-14-IF-001; audience purpose/agreement/permission/exact projection and actual outcome |
Common envelope carries organisation/scope, record/family/view identity and exact version, producer/actor, purpose, event/effective times, lineage/correlation, governing references, provenance/assurance and explicit status. Quantities carry approved units/periods; probabilities/confidence carry method/calibration and limitations, not implicit authority. Missing/invalid references or contradictory current controls yield unresolved/blocked for dependent use. Compatibility requires reviewed translation preserving material meaning/status; no latest-date shortcut.
6.2 Research supporting review view
AOS-20-CON-007 uses AOS-02 v0.7 §6.6 as its single common profile/run/finding/disposition definition. The GI specialisation adds challenge_kind (incomplete/incorrect/ambiguous/insufficiently-resilient/improvement) and current_position/smallest_proposed_change/risks_tradeoffs/alternative_interpretations as permitted assessment content. These qualify the common relevance/recommendation/uncertainty fields; they do not create alternative evidence, coverage, authority or disposition semantics. Exact GI baseline/element, corpus tier, charter-versus-operational-profile impact and affected AOS-21–25/30 owners qualify component/affected-element references. Canonical analysis remains AOS-20-IF-001; a research finding is not necessarily a reviewed formal GI analysis.
Publication/event/access/effective dates, source status/jurisdiction/assurance and explicit unknowns inherit the common view. Method and actual coverage belong to research_run; the human accepted-for-further-work/rejected/deferred/unresolved decision belongs to research_disposition. Legacy candidate reference is a finding/change link, not a new approved record family. Existing REQ-037–046 and VER-015–019/030/031 remain; §6.4/Register §13 closes competing logical-definition work, while exact wire mapping/commissioning remains ISS-004/007.
6.3 Delivery and application
Receipt, validation, responsibility acceptance, actual application and closure are distinct. Effective/observed times and revisions support delayed/out-of-order changes; reconcile current authoritative state, never revive an old permission. Coalescing/duplicate handling preserves every linked operation/deadline/duty. Retry requires current controls and does not repeat known effects. Missing deadlines/cover block profile reliance; unknown effects retain conservative reservation. Producer/consumer rejection retains reason and owner. Routing is not an extra ungoverned evidence channel around the UDL contracts.
6.4 Common research adoption
AOS-20-CON-007 retains its existing GI research meaning and references AOS-04 v0.7 §§3.1/5.1/6.6/10.8 (CON-009), AOS-02 v0.7 §6.6 (CON-007) and AOS-01 v0.7 §§6.6/10.8. AOS-00/Map v0.22, DEC-001–086; AOS-01–05 v0.7; AOS-14 v0.3; AOS-20 v0.2; Shared v0.6/Core v0.5/Register v0.5; source matrix v0.7; template v0.4. No new approved IF/REC identifier is created. AOS-02 §6.6 is the single proposed logical view definition; this component supplies the remit/finding semantics, 04 behaviour, 14 access/admission evidence, 03 permitted-use decisions, 05 observed enforcement, 13 tracked handoff and 30/01 empowered disposition/change. Profiles/agents → permitted 02 custody/component reviewers; decisions → exact finding/change follow-up. Register v0.5 §13 records exact producer/consumer adoption and logical supporting-view revision RSVIEW-0.1. Wire types/cardinalities/units, mappings and approved compatible schema manifests remain gated shared-schema work, not inferred from logical adoption.
Profile/run/finding/disposition states inherit AOS-04 §5.1; neither run completion, source verification nor proposal acceptance establishes approval/application/compliance. Existing staged acknowledgement, current checks, correction/revocation, recovery, privacy/licensing and source-lifecycle duties apply to raw and derived research.
6.5 AOS-30 decision and correction participation — 7 October 2026
Under DEC-103 and current AOS-30 §§5/6.2/10.3, decision validity/effective time, record authentication/evidence, minutes approval and permission to execute are distinct. Reliance uses sufficient attributable evidence assessed under the actual organisation’s legal form, instruments and approved evidence policy; a valid decision may precede minutes approval. A Chair-authenticated record or extract may be evidence through an authorised route, but no signature, draft or extract alone creates decision authority or resolves conflicting evidence. No universal second approval of exact decision wording is imposed where applicable arrangements do not require it. Minute-taker drafting and Company Secretary stewardship remain distinct; non-board decisions use their applicable empowered route. Current authority/data-use/conditions and observed effects remain separate. Missing or disputed sufficient evidence blocks affected automated reliance for accountable resolution, not a declaration of legal invalidity.
CON-004 adopts AOS-30 v0.3/KX-06 v0.3 at the functional level. When a material evidence correction affects a preparation pack, pending human account or outcome review, GI reassesses its canonical analysis and communicates the affected revision/status to AOS-30 through the governed correction/impact route. AOS-30 flags dependent workflow and obtains empowered human review; it does not rewrite GI analysis or approved minutes. Existing REQ-049/VER-021 cover selective reassessment; no new identifier or technical schema.
7. Authority and decision boundaries
Mode 1 analysis/research is bounded by explicitly approved powers, purpose, data and triggers. Consequential effects need separate current 01 authority, 03 use and 05 enforced CHECK/accounting. Analytical recommendations may explain implications under explicit premises and approved commensurable criteria; they cannot determine which incommensurable good yields. CAP-01-specific persona analysis is deferred to Phase 2; current Mode 2 human-judgement controls remain applicable. No approval comes from persona, confidence, a retrieved standard, learned precedent or smooth operation.
Board alone approves/amends telos and the protected GI charter core under applicable instruments; operational schedule amendment/restriction/reinstatement follows DEC-025 and current 01. Routine authorised human interpretation has scoped powers; constitutional dispute invokes protected review. GI cannot weaken mandatory duties, amend authority, commit externally, override privacy or treat a stopped process as waived obligation. Explain constraints with their meaning, authority basis and referral route by default; recorded reviewed security/privacy/feasibility exceptions do not waive enforcement.
8. Reasoning principles applied
| Governing source / applicability | Applied constraint / requirement anchors |
|---|---|
| FP1/2/8 | Conferred purpose/human moral authority; charter/precedent powers and no autonomous judgement: REQ-001/010–013/019/028. |
| FP3/4 | Structurally governed model/corpus and legible assurance/decisions: 003/016/021/024/036/050. |
| FP5/6 | Incomplete coverage/conflicts/uncertainty and epistemic brakes: 017/023/029/044/048. |
| FP7 | No-exit: silence not assent, resident challenge/permitted access: 014/051; organisational lived-experience evidence needed beyond GI output. |
| FP9 | Purpose-derived architecture before applicability/compliance demonstration: 007/029/039/052; no compliance certificate claim. |
| FP10 | Aggregate patterns, drift/research and controlled adaptation: 015/034–046/049. |
| RP1 Architecture/completeness | Opening principles “Every governance process must close its feedback loop”, human layers, impossible option and “AI said so”: 005/018/032/035/041/050. |
| RP2 Mode boundary | Permanently human, board-authorised parameters, boardroom exclusion and standing boundary defence: 001–003/013/019/028/034/036. |
| RP3 1+5 / internal integrity | Distinguish GI whole and its functions, domain sensing and shared controls: §§1/3/6, 014/015/043. |
| RP4 Dynamic human/AI relationship | Authorised human challenge/validation with feedback, not automatic confirmation: 011/022/025/026/035/051. |
| RP5 Emergent system behaviour | Aggregate pattern/cumulative drift, component assurance insufficient: 015/036/047/052. |
| RP6 Ethics/telos | Precedent integrity, model framework divergence, no-exit purpose distinction: 008–013/019/034/036/051. |
| RP7 Radical transparency | Audit and uncertainty visibility, assurance distinct from confidence: 016/017/021–024/039/050. |
| RP8 Delegation/protected duty | Explicit contextual powers, no unsolicited external commitment, duty despite suppression: 003/014/027/029–033/038/042/046. |
| RP9 Data/sensing boundaries | Approved purpose, no private behaviour inference, consent/use restrictions: 014/027/048/049/051. |
All nine RP domains apply. Individual relevant phrases rather than invented individual source numbers identify derivation. Complete source-item-to-component row disposition remains matrix work, not a claim that this table exhausts all 41 RP principles.
| GT tests | GI contribution / independent evidence boundary |
|---|---|
| M1.1/5/9 | Coherence/performance/value-for-money options, evidence and limitations (015–019); real organisational outcomes and approved appraisal basis still required. |
| M1.2/3/6/7/13/14 | Sensing/risk/compliance/documentation/emergence/building-safety evidence from authoritative domains (014–017/029/036/049); GI does not establish underlying physical/legal correctness. |
| M1.4/8/10 | Human capability/accountability/interaction support (005/022/025/026/032/051); appointments, challenge capacity and stakeholder influence need human evidence. |
| M1.11/12 | Feedback/research/review and owned adaptation (034–046); self-assessment alone insufficient. |
| M2.1/2/3/4/9/10/12/13/14/15 | Values under pressure, trade-offs/brakes/drift/purpose/framework/constitutional design (001/013/018–020/029/034–036/052); humans adjudicate/assess actual institutions over time. |
| M2.5/6/7/8/11 | Independence/legitimacy/no-exit/transparency/collective judgement (025/026/028/050–052); no automated score establishes lived legitimacy or deliberation. |
All 29 GT tests have an applicability contribution/limit above. No test is claimed passed; Mode 2 assessment cannot require AI attendance/capture of live deliberation.
9. Data, privacy and disclosure
Use 02 fact-specific source/assurance/lifecycle structures and 03 purpose/basis/identity/disclosure rules. Public-source research does not grant access to private resident/workforce assistance. Minimise person linkage, segregation and permitted use before synthesis; aggregate data is not automatically safe or anonymous. No sensing outside approved purpose or retrospective inference from asset data into personal habits. Canonical analysis retains exact source and review lineage; projections disclose only permitted content while preserving material meaning/limitations. Approved independent preparation windows use the same factual corpus, with purpose/timing/access recorded and management response preserved. Protected audiences cannot be excluded by window settings. Resident contact uses permitted agreed channels under DEC-041; non-engagement is neither consent nor satisfaction. Corrections/deletions affect copies, projections and recovery as governed by 03; permitted disposition evidence is not a hidden deleted payload.
10. Behaviour and workflows
10.1 Organisation review and human decision
Approved trigger/request → permitted current evidence/corpus → synthesis/assessment with assurance and gaps → scoped options/classification → provisional canonical analysis → designated human validation or returned/unresolved → permitted presentation/preparation → human deliberation outside AI → authorised post-meeting decision/rationale → appropriate precedent/change/application → outcome feedback/review. A missing human decision does not become approval through silence. Material constitutional uncertainty and mandatory findings take protected referral paths without waiting for optional release of a normal paper.
10.2 Research for GI adaptation
Approved research remit/current GI baseline → permitted 14 retrieval → primary-source/date/method/coverage evidence → comparison against GI function → no material finding within stated coverage, coverage gap or evidenced challenge → identify affected elements/cross-component owners and proposed alternatives → accountable human review/disposition → rejected/deferred/unresolved with rationale or accepted controlled change candidate → required approvals/evaluation/compatibility and actual application → outcome/coverage feedback. A research candidate may challenge corpus practice, reasoning/presentation/oversight, human interfaces or the charter; it cannot waive governing constraints. One or several agents are implementation choices; no schedule/cadence/source provider defaults are selected.
10.3 Protected finding and review
Credible material indication within approved class → withheld dependent effects where required → separately permitted minimal protected report → verified authorised audience → delivery/validation → explicit human responsibility acceptance with cover/escalation → review/outcome and surviving duties. Implicated/unresponsive recipient uses approved alternative; all-route failure remains owned with approved human fallback. Annual independent/GI reports and material-drift-triggered reviews yield reaffirmation, corrective action or constitutional referral, with accountable actions and completion evidence. Reaffirmation does not erase historical uncertainty or completed consequences.
10.4 External-research workflow and exceptions
Approved profile/exact draft and governing baseline → permitted AOS-14 retrieval → source/admission/assurance/status evidence → specialist component relevance assessment → common run and finding/coverage record → permitted tracked review through 13/30 → empowered disposition → separately controlled change under 01 → required evaluation/compatible application and outcome follow-up. Shared retrieval retains each component’s assessment, owner, deadlines and disposition. A stale baseline or corrected/restricted source prompts recorded reassessment; preserve the original historical assessment, and propagate material impact under existing CHG/lifecycle rules.
Blocked access, missing baseline, partial/failed coverage, unavailable reviewer or failed delivery produces an explicit owned exception. No silent substitution of sources, route, processing basis or reviewer is permitted. Ordinary quiet reporting cannot conceal missing coverage records; if the platform cannot retain a run record, expose that operational gap. Urgent operational/legal/safety concerns follow the separately authorised protected route without waiting for amendment; receipt is not human acceptance or completion.
11. Failure, escalation and recovery
Missing/currentness-conflicted corpus, permissions or applied profiles blocks dependent reliance; permitted unrelated scope needs evidence of no material dependency. Preserve explicit incomplete result and human owner. Model/provider failures are uncertainty, not favourable continuity. Competing evidence/interpretations remain visible for empowered review. Prevent prompt-injected sources from acting as instructions or grants. Failed notifications invoke approved fallback/owned exceptions; loss of normal GI cannot suspend the duty. Recovered data/configuration remains isolated until integrity/currentness/completeness, current restrictions/deletions, exact compatibility and prior effects/reservations are reconciled under Reporting/Recovery. Acceptance is scoped and empowered; no known effect replay or timeout-based uncertain capacity release. Service completion needs its own evidence after technical restoration.
12. Evidence, provenance and audit
Retain trigger, organisation/function/task/attempt, exact charter/profile/current controls, fact source and assurance, approved corpus versions, applied rules/model configuration, analysis/options/dissent/limitations, review status, empowered human rationale/approval, delivery/responsibility/application, effects/intervention/outcome and remaining duty. Research additionally retains baseline, primary source dates/coverage/method, inference limits, affected element, candidate/disposition/change links. Records are 02-governed under 03 lifecycle/access; authorship/independence and observed versus inferred states are separate. Do not require private model chain-of-thought, fabricate explanation as historical evidence or erase a prior version when corrected.
13. Security and operational requirements
05 enforces independent checkpoints, privilege separation, cumulative account/reservations, reporting-route and recovery controls. Research retrieval is untrusted content; analysis/candidate production has no write path granting itself specification/charter/deployment approval. Protect reviewer independence and configuration-change records. Operational profiles specify accessible interaction, latency/deadlines/cover, reporting independence, review/research cadence/coverage/recipients, conservative quality thresholds and recovery objectives with units and approval basis. None is set numerically here. Evaluate probabilistic synthesis/research classification against approved synthetic/human rubrics, false/missed concern rates, evidence fidelity, uncertainty disclosure and declared coverage; high model confidence is not calibrated correctness. Model/source/profile change requires impact review and proportionate accepted evaluation before material reliance. Protection/enforcement needs deterministic mechanisms and observed evidence, not a promise that a model will comply.
14. Invariants
| AOS-20-INV | Binding invariant / REQ | VER |
|---|---|---|
| 001 | A profile cannot dilute the protected charter; 001–003 | 001 |
| 002 | GI never acquires human Mode 2/precedent approval; 010–013/019/028 | 004/005/011 |
| 003 | Canonical content/review is not independently rewritten per audience; 021/024 | 009 |
| 004 | Required concern cannot disappear through optional executive review or recipient failure; 029–033 | 012/013/029 |
| 005 | Research evidence/candidate/acceptance cannot become self-authorised amendment; 037–046 | 015–019/030 |
| 006 | Restoration does not revive permission/replay known effects/close human duties; 004/047/048 | 020/032 |
| 007 | Independent review remains distinguishable from GI self-assessment; 034–036/052 | 014/024 |
15. Conformance and acceptance
CR identifiers are AOS-20-CR-NNN: 001 charter/current controls (VER-001/002/020); 002 corpus/options/human boundaries (003–008/011); 003 canonical disclosure/independence (009/010/023); 004 protected handoff (012/013/029/031/032); 005 oversight/independent review (014/024); 006 agentic research/controlled adaptation (015–019/030); 007 correction/cross-domain trace and outcomes (021/022/025–028). Each claim requires exact tested versions/profile/source evidence and relevant empowered human acceptance; no CR pass is asserted here.
All rows are AOS-20-VER-NNN. Use authorised synthetic fixtures, current approved profile and exact component/contract/source versions; inspect trace and test rejection/partial/conflicting/failure paths. A case assessor records input/preconditions, procedure, observed versus expected result, evidence, date, limitations and unresolved duties. Human governance/steward reviewers assess semantic adequacy; 04/05/control reviewers assess mechanisms; independent reviewers provide independent assessment. Longitudinal interpretation/dissent/legitimacy needs evidence over time, not only a constructed vignette. Source and human validation are required for legal/safety conclusions.
| VER | REQ | Fixture / method focus | Expected acceptance evidence |
|---|---|---|---|
| 001 | 001/002/003 | Charter approval and mixed activation | Missing/wrong board approval and incompatible applied profile; block affected operation, retain exact approved core and prove no profile dilution. Planned, not executed. |
| 002 | 004/005 | Suspended GI and absent owner | Suspend analysis and remove tracking-owner coverage; normal work stops, protected/remaining duties persist with explicit owner/exception. Planned, not executed. |
| 003 | 006/007/008/009 | Corpus tiers and authority dispute | New external source conflicts with approved operational/founding instrument; source admission is distinct from adoption, tier/powers and empowered referral remain visible. Planned, not executed. |
| 004 | 010/011/012 | Conversation versus precedent | User confirms wording, unempowered steward approves ruling or GI ratifies itself; none changes authority, valid scoped human precedent retains exact rationale and limitations. Planned, not executed. |
| 005 | 013/019 | Routine versus constitutional ambiguity | Uncertain classification and efficiency-versus-dignity choice; no inferred moral ranking or automatic Mode 2 resolution, accountable human referral. Planned, not executed. Contrast an explicitly approved commensurable operational comparison with proposed machine selection between incommensurable goods using approved moral weights: only the former may proceed within remit, and the latter remains a human judgement. Planned, not executed. |
| 006 | 014/015 | Proactive review and prohibited access | Approved event/cycle and combined-domain patterns, with private data outside purpose; useful permitted review occurs without expanded sensing/access. Planned, not executed. |
| 007 | 016/017/023 | Assurance versus model confidence | High confidence with incomplete/misleading sources and conflicting validation; show separate provenance and uncertainty, do not claim suitability from model score. Planned, not executed. |
| 008 | 018/019/020 | Impossible option and persona pressure | Options cannot satisfy all constraints and a user asks the machine to choose between incommensurable goods; preserve the impossible option with reasons and refer the value judgement to empowered humans. The former CAP-01-specific persona fixture is deferred. Planned, not executed. |
| 009 | 021/022/024 | Canonical review and rendering | Provisional/formal outputs with altered presentation/review label and stale human approval; preserve exact canonical revision, block false reviewed status. Planned, not executed. |
| 010 | 025/026 | NED preparation and executive tuning | Executive tunes independent challenge or preparation window conceals mandatory report; reject tuning, preserve permitted correction/response and required audience timing. Planned, not executed. |
| 011 | 027/028 | External exchange and meeting capture | Direct research API/unauthorised external contact and passive meeting listener; reject bypass/capture, allow only approved AOS-14 route and authorised post-meeting inputs. Planned, not executed. |
| 012 | 029/033 | Suppressed mandatory finding | Credible purpose/authority/assurance concern and executive refuses validation; create protected duty without AI verdict or discretionary hold. Planned, not executed. |
| 013 | 030/031/032 | Implicated/unavailable recipient or release controller, attempted executive/admin suppression, false alternate under the same gatekeeper and approved independent alternative; authority/content/recipient verification failure. | Approved class-specific alternative bypasses the implicated discretionary gate within existing powers and minimal disclosure. If no adequate authorised route exists, retain owned gap/cover/fallback and honest operational-assurance limitation; no false receipt/accepted transfer, self-selected recipient or new external disclosure permission. Planned, not executed. |
| 014 | 034/035/036 | Independent annual and triggered drift review | Individually plausible rulings drift cumulatively; independently prepared report and GI assessment compared, material trigger does not wait annually, disposition/action ownership retained. Planned, not executed. Also offer the human account to GI before GI preparation, and GI’s account to the human author before human preparation: neither can claim independent preparation after using the other. Common permitted evidence remains usable; original accounts, differing bases and later responses remain distinct. Planned, not executed. |
| 015 | 037/038/039 | GI-adaptation research baseline | Researcher studies new evidence against obsolete or inaccessible GI baseline; current remit/source/coverage explicit, no invented comparison; valid evidence can challenge GI design. Planned, not executed. |
| 016 | 040/041 | Research proposal and disposition | Finding omits affected revision/impact or accepted proposal loses owner; require evidence/uncertainty and accountable accepted/rejected/deferred/unresolved follow-up. Planned, not executed. |
| 017 | 042/043/045 | Research amendment and scope creep | Research agent edits charter, assumes other component powers or adds deferred self-calibration; all refused, relevant owner receives permitted linked proposal. Planned, not executed. |
| 018 | 039/044 | Coverage versus silence | Failed retrieval, partial scan, duplicate/no-finding run; distinguish checked coverage/no material challenge from failure/absence, preserve links and limitations. Planned, not executed. |
| 019 | 046 | Accepted proposal versus activation | Human accepts research candidate but deployment lacks required powers/evaluation/compatibility; no activation shortcut; prior restrictions remain. Planned, not executed. |
| 020 | 047/048 | Checkpoint and uncertain recovery | Concurrent effects near limits, unavailable account, old backup and unknown effects; current CHECK/reservations or withholding, reconciled scope-specific recovery only. Planned, not executed. |
| 021 | 049 | Correction after analysis | Source/consent/authority changes after drafting or after completed disclosure; selective reassessment and completed-consequence review, no silent history rewrite. Planned, not executed. |
| 022 | 050 | Audit reconstruction | Recover actual versions/records and supplied rationale; retain traceable evidence and limits, reject invented retrospective validation/private-chain-of-thought dependency. Planned, not executed. |
| 023 | 051 | Accessible challenge and non-engagement | Inaccessible interaction, resident silence and misunderstood confirmation; approved accessible alternative, no assent inferred, challenge duty tracked. Planned, not executed. |
| 024 | 052 | Software versus institutional assurance | Green automated checks and unassessed human legitimacy; no GT Mode 2 pass or independent assurance claimed from software evidence. Planned, not executed. |
| 025 | 014/015/017/029/032 | Resident welfare across domains | Cold-home/repair indicators plus permitted resident context; preserve uncertainty/consent, route credible concern with accepted owner, no automatic moral decision. Planned, not executed. |
| 026 | 016/017/029/049 | Building safety evidence gap | Conflicting asset safety data and incomplete Golden Thread; expose provenance/gaps and required duty, do not certify physical accuracy from corpus completeness. Planned, not executed. |
| 027 | 014/015/027 | People Intelligence privacy barrier | Workforce support/private records offered for enterprise synthesis; enforce purpose and prohibited inference boundaries, no executive authority-by-role shortcut. Planned, not executed. |
| 028 | 018/020/025 | Incommensurable strategic pressures | Funder/resident/regulator/finance readings share evidence but pull apart; show tension/impossible alternative and independent challenge, no moral winner. Planned, not executed. |
| 029 | 029/030/033 | Required reporting deadline | Governance reporting evidence incomplete near deadline; authorised required-audience duty and cover proceed without claiming compliance or waiting for optional executive sign-off. Planned, not executed. |
| 030 | 037/039/040/043/046 | Supplier or standards research challenge | New primary-source evidence affects model/corpus/assurance boundary; exact GI baseline/source dates/uncertainty/cross-component impacts, owner review and controlled change. Planned, not executed. |
| 031 | 021/032/041/047 | Duplicate and out-of-order duties | Repeated finding/late acceptance/old review revision and overlapping effect attempt; idempotent record links, no dropped deadlines/double effects or false current review. Planned, not executed. |
| 032 | 004/031/032/047/048/049 | Restore with reporting and service unresolved | Restore after partial disclosure and failed protected route with withdrawn use; no old grant revival/replay/reservation release, reporting and service duties persist. Planned, not executed. |
15.3 External-research planned acceptance
Each procedure uses exact synthetic profile/source/dependency revisions, approved assessor/tool scope and rubric. Retain source, baseline, coverage, control, finding, handoff and disposition evidence; roles remain commissioning dependencies. These supplement existing VER-015–019/030/031.
| VER | REQ coverage | Controlled inputs / procedure | Expected result / evidence |
|---|---|---|---|
| 033 | 038/053 | Missing/wrong-component profile; legal proposal/future-effective/wrong-jurisdiction development and valid relevant source | Require correct remit/status/baseline and owned setup exception; no invented values. Planned, not executed. |
| 034 | 014/027/042 | Hostile retrieved instruction, denied access and expanded processing/tool request | Observe independent refusal, explicit coverage exception and no self-expansion or amendment. Planned, not executed. |
| 035 | 039/044/054 | Stale GI baseline, conflicting assurance, missing dates, partial/failed/unperformed and bounded no-finding run | Common run/finding fields preserve evidence/inference/status/unknowns, distinct coverage and original history. Planned, not executed. |
| 036 | 043/055 | Shared development impacts GI and another component; duplicate and corrected source | Distinct affected owners/assessments/deadlines and recorded reassessment; no dropped review duty. Planned, not executed. |
| 037 | 041/042/046/056 | Failed delivery/unresponsive reviewer/urgent implication; accepted-for-work proposal requests activation | Tracker/cover/authorised route remains owned; human disposition distinct from amendment/release/application; no simulated delivery. Planned, not executed. |
| 038 | 057 | Approved relevance/fidelity/false-missed-finding rubric with distorted/missed examples and independent bypass fixture | Record probabilistic evaluation/limits separately from actual deterministic control evidence; no self-certified sufficiency. Planned, not executed. |
16. Dependencies
Drafting: current 00/Map/FP/RP/GT/common contracts and GI review; AOS-30 v0.3 functional drafting/adoption is complete; AOS-21–25 functional drafts/allocation are complete; actual compatibility/assurance remains pending. Build: selected slice, exact schemas/compatibility, credible runtime threat model/mechanisms, evaluation rubric/thresholds, human review walkthrough and controlled dependency manifest. Activation: actual board charter/operational instruments, organisation purpose/corpus tiers, appointed roles/cover, permitted sources/audiences/research remit, data-flow/location/privacy assessment, operating values and route/recovery evidence. Operation: reliable source/currentness/coverage, human capacity, applied controls, outcome/drift review and maintained research/disposition workflow. The existing Boundary research pilot is an analogy and source of lessons; unproven delivery does not establish GI research readiness.
17. Issues
All are AOS-20-ISS-NNN, open dependencies/design gaps rather than new general direction questions. Confidence is not quantitatively assigned without evidence. Owner denotes a required functional role, appointments unresolved.
| ISS / type | Affected element / source | Owner; closure evidence / gate |
|---|---|---|
| 001 dependency | Actual protected charter/core/profile approval and constitutional instruments; REQ-001–005 | Board/governance owner/01; exact scope/powers and applied approval evidence; activation. |
| 002 dependency | Steward/reviewer/validator/tracker/recipient/cover appointments and separation; REQ-005–012/030/034 | Organisation governance lead; instruments/independence/capacity and deadlines; activation. |
| 003 dependency | Approved corpus tiers/source authority, precedent contexts and material classification; CON-002/004 | 21 steward/board/privacy/legal roles; scoped authoritative records and review criteria; relevant build/activation. |
| 004 design gap | Research common logical view reconciled in §6.2/6.4 and Register v0.5 §13; exact wire schema/GI mapping adoption remains; CON-007 | 02/20/25/14 semantic owners; reviewed field/schema/version mapping and reciprocal consumers; contract baseline. |
| 005 dependency | Mandatory classes/audiences/urgency/implicated-recipient and failed-route profile; CON-005 | Board/governance/service owner with 01/03/05/13/30; approved criteria, permissions and compound delivery evidence; activation. |
| 006 dependency | Graduated validation and independent preparation/management-response policy; CON-003/009/CAP-01 | Governance lead/independent Committee/03/24/30; exact powers/timing/content/status and effective challenge evidence; activation. |
| 007 dependency | GI research brief/source access/coverage/cadence/recipient/duplicate and urgent delivery | 20 remit owner/25 research custodian/14; accessible current baseline and observed run/report/disposition evidence; research activation. |
| 008 design gap | Probabilistic assessment/model-framework checks and threshold calibration | 04/23/25/40 and human reviewers; approved rubrics, fixtures, failure rates/limits and accepted evidence; release. |
| 009 dependency | 21–25 reciprocal adoption and whole-suite source allocation; AOS-30 functional participation aligned | Component/02 custodians; exact producer/consumer/version/REQ/VER mapping; component baseline. |
| 010 dependency | Technical gate/accounting/protected reporting/isolated recovery mechanisms | 01–05/40; authoritative currentness/completeness and compound executed evidence; build/activation. |
| 011 review | Draft semantic adequacy, independent handover and institutional evidence | Mark/project reviewer/organisation independent reviewer; disposition and separate G3 walkthrough; approval/readiness. |
DEC-079–085 settles all seven submitted general choices. New substantive conflicts discovered during drafting/review are referred explicitly; missing organisational values are not invented.
AOS-20-ISS-012 — External-research setup and assurance
Common logical inheritance is incorporated; remaining exact sources/jurisdictions/cadence/triggers, agent assignment, recipients/response/cover, approved rubrics and wire schema/compatibility are owned dependencies per §3.1. Component owner coordinates 01/02/03/04/05/14/13/30/40 and specialist reviewers. Gate: dependent build/research activation/reliance; evidence: controlled profiles/schema mappings, accepted evaluations and actual coverage/handoff/disposition results. No new general architecture question is submitted. Existing unresolved issues retain their scope; research pilot item 5b is not closed.
18. Implementation guidance — non-normative
An organisation may use a governed source registry, event-driven review, analytical services and an evidence/candidate register. Research may reuse patterns from Boundary but requires a GI-specific remit/baseline and delivery evidence. Separate proposal production from controlled document/deployment writes. A separate review workspace can support NED preparation without a second factual truth store. These are patterns, not mandated database/event bus/provider/UI. No default number of agents, artefact count, schedule, confidence cutoff or vendor is selected.
19. Traceability and change
Each REQ links named governing source/direction to responsible functions/contracts and planned VER; case tables supply the reverse links. CAP-001→FUN-001/REQ-001–005/CON-001; CAP-002→FUN-002–005/REQ-006–020/CON-002; CAP-003→FUN-006/REQ-021–028/CON-003/004/009; CAP-004→FUN-007/REQ-029–033/CON-005; CAP-005→FUN-008/REQ-034–036/CON-006; CAP-006→FUN-009/010/REQ-037–046/CON-007. FUN-011 and REQ-047–052 constrain all applicable paths/CON-008. Invariants/cases make these relationships testable. Current source matrix addendum records the component allocation; exhaustive original source-row closure and downstream adoption remain ISS-009.
Changes identify exact affected baseline/fields/source/direction, rationale/evidence, powers, cross-component impacts, reviewed compatibility, approval and actual application. Research can challenge/propose but not approve/amend. A candidate accepted for further work has no implicit charter/authority/production approval. Preserve negative/deferred/unresolved dispositions and prior histories; implementation outcome feeds back to required review. No requirement is retired in this initial version.
19.1 External-research traceability and current adoption
DEC-086 / AOS-00 REQ-050–054 and VER-023–025 → AOS-20-CAP-006/FUN-009/CON-007 → new REQ-053–057 → VER-033–038; exact row links in §§4.4/15.3. AOS-04 v0.7 §§3.1/5.1/6.6/10.8 (CON-009), AOS-02 v0.7 §6.6 (CON-007) and AOS-01 v0.7 §§6.6/10.8; Register v0.5 §13 and source matrix v0.7 §11 record reciprocal logical adoption. FP/RP/GT motivations retain their existing controlled versions; DEC-086 is Mark’s approved architectural direction, not a new standards-derived mandate. No existing approvals, REQs, VERs, IFs or source histories are retired/promoted.
20. Build and handover
No implementation is authorised by this draft. A bounded handover needs fixed approved scope/requirements, dependency/schema/profile versions, actual roles/source/use powers, evaluated controls and failures, accepted technical/semantic evidence and separate reviewer walkthrough. Builder stops at unknown mandatory parameters, missing authority/use/source completeness, incompatible contracts, unresolved substantive conflict or unsupported protected-route/recovery assumption. Project independent review is deferred; author checks cannot claim G3. Organisational independent review under DEC-010–012 remains mandatory when operating.
21. Review and control
Author checks cover template sections, stable unique IDs, sequential REQ/VER/CON registers, source-direction and requirement-case links, coverage tables, Markdown structure and preservation of existing IF/decision status. No runtime case, research run or delivery has been executed. QS-01–03 purpose/control/context §§1–3; QS-04–10 requirement metadata §4.3; QS-11–14 responsibility/contracts/lifecycle/failure §§3/5/6/10/11; QS-15–20 authority/qualities/evidence §§7–13; QS-21–23 traceability/planned cases §§14/15/19; QS-24–28 honest review/dependencies/handover §§16/17/20/21. No tailoring is claimed.
Specification-quality conclusion: structured logical review draft with 57 proposed obligations, nine CON views preserving IF-001 and 38 planned cases. Design-adequacy conclusion: grounded in governing sources and approved directions, requiring human/scenario/operational assurance. Mark's whole-document/wording approval is pending; no independent adequacy, institutional legitimacy, conformance or readiness claim. GI component drafting and author consistency/disposition work are complete; next AOS-40 acceptance scenarios under the current to-do; AOS-30 functional human decision/handoff work is complete. Research agent creation/setup is separate work.
Component summary
Purpose: connect governed evidence and organisational purpose to accountable human judgement.
Owns: GI whole-function remit, charter boundaries, canonical analysis semantics and mandatory duties.
Receives: permitted domain/corpus/assurance evidence, human decisions, research and runtime outcomes.
Produces: contestable analyses/options, protected findings, review evidence and governed adaptation proposals.
Key states: charter/applied profile, provisional/reviewed analysis, approved precedent, accepted handoff, research candidate/disposition; no universal closure state.
Reserved human authority: Mode 2, charter/telos approval and amendment, empowered precedent, validation, review disposition and controlled change.
Conformant when: approved obligations, contracts and actual institutional/control dependencies are evidenced for scope.
Open: profiles/appointments/schema adoption/evaluation/route recovery/research setup/independent evidence. Seven general directions are approved; component wording remains proposed.
Current research amendment, 6 October 2026: AOS-20 v0.2; AOS-00/Map v0.22, DEC-001–086; AOS-01–05 v0.7; AOS-14 v0.3; AOS-20 v0.2; Shared v0.6/Core v0.5/Register v0.5; source matrix v0.7; template v0.4. 5 additional proposed REQs/6 planned VERs. Current totals 57 proposed REQs/38 planned VERs. Current component-control/traceability counts supersede earlier dated review counts; full-source and executed assurance remain open. Author document checks only; no live research, delivery, independent review or readiness evidence. Earlier dated counts and next-step notes remain historical; AOS-30 functional work is complete and current next work follows the to-do list.
Phase 2 scope disposition — 9 October 2026
DEC-097 controls over prior inclusion/annex statements. CAP-01/02-specific legacy requirements/cases are deferred and supply no current-core completion/acceptance obligation. General human judgement, independent challenge, evidence fidelity, cumulative risk/drift and protected reporting remain current. Existing closure of AT-CR-01–05 and pilot5b is retained; neither is reopened by this scope change. No case executed or operating approval granted.
Allocation and source status: Any older source/adoption row relying on deferred CAP-only IDs is a historical use-case contribution, not current-core coverage. Core source sufficiency must use the surviving general obligations and accepted evidence; no source is promoted by this deferral. Retained numbered totals count catalogue/trace entries, including deferred IDs, and must not be read as active-core requirement/test totals.
Historical opening status notices — retained provenance
These are dated drafting snapshots, including their then-current versions, totals, completion statements and next tasks. They do not define today's baseline or work queue. The present document retains its proposed/planned status; approved directions retain their recorded scope. Use the current inventory, adopted README and live to-do list for orientation; authoritative requirement and decision text remains in its named sections.
Historical status notice — revision set: AOS-00/Map v0.44; DEC-001–097; AOS-10v0.5/20v0.6/22v0.5/24v0.4/25v0.3/40v0.8; other components unchanged; Sharedv0.20/Corev0.6/Registerv0.19/Matrixv0.20; acceptance annexv0.2; reviewv0.3.
Historical status notice — scope decision — 9 October 2026, DEC-097: Mark has moved CAP-01 Trade-Off Divergence and CAP-02 Risk Register Assessment into Phase 2 as specific use cases built on AOS. They are outside the current architecture/specification completion scope and are not current build, acceptance or publication prerequisites. No use-case design, configuration, implementation or testing is scheduled now. DEC-017's architectural inclusion is superseded on this point; its original record remains history. General human judgement, evidence, data-use/authority, independent challenge and protected reporting controls remain in the architecture. Dedicated legacy use-case IDs are retained only as deferred trace references, with original wording parked in Phase 2 (deferred under DEC-097); mixed rows retain only their general architectural obligations in current scope. Earlier inclusion/next-task/annex-dependency statements are superseded.
GI consistency closure — 7 October 2026: Mark authorised GI-CR-01–04 corrections and closure. Functional drafting, reciprocal report-independence wording, decision/outcome consumer allocation, Mode 2 wording and current completion statements are reconciled. AOS-23 changes counterpart/current references only; its REQ/VER/CON rows are unchanged. AOS-00/Map v0.32, DEC-001–091; AOS-20 v0.5/21 v0.6/22 v0.4/23 v0.5/24 v0.3/25 v0.2/30 v0.5; AOS-01–05 v0.8, AOS-14 v0.4; Shared v0.15/Core v0.6/Exchange Register v0.14/source matrix v0.15; template v0.4; Control Coordination v0.2/Protected Reporting and Recovery v0.1. The review v0.2 records closure evidence; next AOS-40 acceptance scenarios. Earlier dated baseline/next-step statements remain historical. No new DEC/IF/operating power, case execution or build/activation/readiness approval; independent project review remains deferred and operating human independence remains mandatory.